Arvind The Park Construction status is currently in the ongoing stage. It is a plotted development project in North Bangalore rural. The project covers over 100 acres at Lingadheera Gollahalli, off IVC road, beside the DC office. This project is a plotted development with 340 plots. The construction work has started and is ongoing. The project is registered under RERA with the number PR/050325/007549. It is designed to include 13 towers with 2 basements, a ground floor, and 24 upper floors. The size of each plot ranges from 600 sq ft to 2400 sq ft. The construction is on track to be completed by 31 December 2029.
The first step of the work was to prepare the land for building. Workers cleared the more than 100 acres of debris, old trees, and other obstacles. They used heavy machines to move the earth and make the ground level. The team measured the land carefully and marked where each of the 340 plots would be built. Engineers checked every measurement to make sure the work meets RERA guidelines. This work on site preparation is very important because it creates a strong and safe base for all future buildings. The careful work on the land helps make sure the project will last for many years.
Infrastructure and Utility WorkAfter the land was cleared and levelled, work began on basic infrastructure. New roads are being built to connect all parts of the project. The teams are installing water pipes to supply clean water to every plot. They are also setting up drainage systems to handle rainwater and wastewater. Electric cables are being laid out so that power reaches all homes. Streetlights are added to ensure safety at night. In addition, a sewage system is planned to remove waste safely. Every step in installing these utilities is checked to ensure good quality and safety. This careful work on infrastructure makes sure that the community will have all the services it needs.
Safety and Quality ControlSafety is very important at Arvind The Park. All workers wear helmets, gloves, boots, and other safety gear at all times. Supervisors check the work daily to ensure that everyone follows the safety rules. The team uses modern and safe machines to work faster without risking safety. Every material used in construction is tested for quality before it is used. Strict quality checks are done at every step, from land preparation to the construction of towers. These safety and quality measures help in preventing accidents and ensure that the project will be strong and long-lasting.
Current Progress and Future PlansArvind The Park Construction status shows that the land is fully prepared, and basic roads and utility systems are in place. Construction of the towers is happening in stages, with floors built and inspected one by one. The project team keeps a close watch on the progress so that the work is completed on schedule. The final goal is to finish the project by 31 December 2029, and every step is planned to meet that target.
ConclusionEvery detail of Arvind The Park is managed with care. The team works hard on clearing the land, building roads, installing utilities, and constructing towers. Safety and quality are kept high with every action taken. The project is on track to be finished in four years. The work at Arvind The Park shows the effort and care of every worker, and soon, the community will welcome new residents to a modern and well-built neighbourhood.